SENIG

Home / Factory

Panel Work And Steel Work, Under One Roof

Every SENIG product passes through the same plant in Wujin District, Changzhou. The photos below are taken on site.

Factory tour

Inside The Senig Plant

Two minutes through the panel line, the steel line and the packing hall.

Aerial view of the SENIG factory building
Panel cutting machinery on the woodworking line
Second woodworking bay with edge banding equipment

Panel Line

Cutting, edge banding and cleaning

Engineered wood panels are cut to size, edge banded and cleaned before assembly. The panel line feeds the tops, shelves and drawer fronts used across the desk, table, cabinet and vanity ranges.

Panels are checked for surface defects and edge quality before they move to the assembly bays.

Steel Line

Tube cutting, welding and powder coating

Steel tube is cut, bent and welded into frames at dedicated welding stations. Frames are then powder coated in the finish specified for the order.

This is the same line that produces the legs, bed frames and shelving uprights used across all five product ranges.

Welding stations on the steel line
Powder coating line with parts hanging on the conveyor
Precision area for metal parts
Panel cleaning station

Packing

Flat-pack cartons, labelled for your programme

Assembled units are checked, dismantled where the design requires it, and packed flat with hardware packs and instructions. Cartons are marked to the customer's requirement before they leave the hall.

Packing hall with rows of cartons

Standards We Work To

Production standard
ISO 9001
Process control
ERP-tracked batches
Materials
Environmentally tested
Third-party testing
Available on request
Factory audits
Completed for named customers
Monthly capacity
100,000+ sets

Want To See A Specific Process?

Tell us which part of production you need documented and we will send photos or arrange a video walkthrough.